worldinoutRegisterLogin | Set Homepage | Save desktop | Mobile | Qr code
Member
Guangzhou Kinte Electric Industrial Co.,Ltd
Automated Assembly Line;Automotive Assembly Line;Refrigerator Assembly Line
 
Your current location:Home » Sell » Back Row Machine Room Three Phase HF Welding Machines 0.35 0.45 Mpa 11KVA

Back Row Machine Room Three Phase HF Welding Machines 0.35 0.45 Mpa 11KVA

Click image to view full size image
Title: Back Row Machine Room Three Phase HF Welding Machines 0.35 0.45 Mpa 11KVA 
Brand: -
Model: -
Unit price: Negotiable
MOQ: -0 -
Quantity: Negotiable
Delivery date: Since the payment date Days delivery

Contact: Joe Zhao (Ms.)    
Mobile:
Telephone:

  Inquiry
Details

Back Row Machine Room Three Phase HF Welding Machines 0.35 0.45 Mpa 11KVA

 

Quick Detail:

 

Using high frequency induction power supply output low voltage and high current,the use is on the solder points,Solder joint surface produce high-frequency electronic movement,forming eddy current,all the electrons move to generate heat (Skin effect and proximity effect),Make solder ontology surface temperatures to rise to the welding temperature,melting the welding ring and achieve the result of the solder joint sealing.

This equipment is main used for refrigerator,freezer,air-conditioner etc Refrigeration appliance pipe welding.

  1. All the business of Kinte is international and abroad only.

      2. We have a large team and we provide one-station service

 

Specifications:

 

1   Model TRHF-KV-

2   Input pressureThree phase 380V±10% 50/60HZ

3   The maximum input power: 11KVA

4   The maximum output power    10KVA

5   Oscillation frequency 21-27KHz

6   Cooling Model water-cooling

7   Water quality requirement  distilled water

8   Hydraulic pressure 0.350.45 Mpa

9   Flow   10 /min

10 Equipment environment requirements    Temperature 5~40   humidity85%

 

Description:

 

High frequency welding machine can solve the problem of refrigeration electrical appliances enterprise welding equipment

 

Welding leakage and welding plugging caused in-refrigeration

The welder needs high technical skills ,and the training time is very long.

Personnel fluidity big, high turnover rate

The solder amount is very big and the cost is too high

Combustible gas, open flame operati
Back Row Machine Room Three Phase HF Welding Machines 0.35 0.45 Mpa 11KVA

Inquiry
Sell
  • No Category
New Login
Company QR code
Anytime Anywhere Mobile